Fiber Optics 101: Fiber Testing Toolkit
October 2, 2026
A good fiber testing toolkit is what separates a guess from a measurement — the difference between hoping a link works and proving it does. Fiber faults are invisible to […]
Login to the Amphenol Broadband Resource Portal for pre- and post-deployment support.
Login
October 2, 2026
A good fiber testing toolkit is what separates a guess from a measurement — the difference between hoping a link works and proving it does. Fiber faults are invisible to […]
September 30, 2026
Remote power monitoring turns an unmanned DC site from a black box into a managed plant. Learn what you can’t see without it, and how visibility prevents outages and blind truck rolls.
September 25, 2026
Extended Spectrum DOCSIS expands usable downstream spectrum toward 1.8 GHz and extends the economic life of HFC — but the lowest-rated tap, splitter or amplifier in a segment sets the real ceiling.
September 23, 2026
DC backup power decides whether a grid event is a non-event. Learn why backup is a sizing and maintenance discipline, how battery plants quietly fall short, and what ride-through really requires.
September 18, 2026
AI, cloud and low-latency traffic are pushing broadband data center capacity closer to subscribers. Amphenol spans the range — 36,864-fiber frames in regional facilities down to modular HyperEdge sites at the edge.
September 16, 2026
DC power distribution is the reliability foundation of an edge or headend site. Learn why the power plant, not the electronics, is the usual point of failure, and how fusing and capacity decide uptime.
September 10, 2026
By 2019 Amphenol had assembled a broadband portfolio spanning coax, RF, fiber and network infrastructure. One piece was missing: outside plant protection. The acquisition of Charles Industries supplied it.
September 9, 2026
Migrating from HFC to 10G-PON/25G-PON is the defining network transition of this decade — and the good news is operators can do it on the same fiber, not a parallel […]
September 2, 2026
Pre-connectorized fiber turns skilled field splicing into plug-and-play. Learn how factory-terminated assemblies beat the labor gap and compress fiber build schedules.
August 26, 2026
The FTTH drop is the most repeated task in a fiber build, and where cost concentrates. Learn how pathway, drop, and terminal choices make the last 100 feet fast to install and cheap to upgrade.
Sign up for our newsletter to receive the latest news and industry trends:
Sign UpSign up for our newsletter: